HSE Plan_FPSO

The engineer will be responsible for ensuring that the design, engineering and execution of work is carried out safely and to a high standard. The engineer will participate in all phases of the project including, concept selection, FEED and project execution to ensure the technical objectives are met within the approved scope, budget and schedule and to the required quality standards. The position is based in Nigeria and it is expected that the duration of the project will be 3 years. The engineer will be expected to travel to locations where equipment is being manufactured such as, but not limited to the UK, US, Singapore, Dubai and Nigeria including periods offshore during hook up and commissioning. Maintain full responsibilities for engineering sub-contracts, interface and changes in accordance with local regulator and Schlumberger corporate requirements. Schedule, plan and develop engineering scopes of work and execution plans while ensuring full adherence the overall Project Execution Plan and Basis of Design. Help manage the sub-contractors engineering team and maintain commitment to deliver schedule requirements, safety and high quality deliverance of work. Meet safety and high quality requirements whilst approving all engineering output.

White Paper FPSO MBC

The area lies miles kilometers offshore Australia in to feet to meters of water. In , Ichthys was discovered by three exploration wells, and then appraised by five wells three years later. On March 27, , the partners reported that the field is commercially viable, and then submitted the field development plan for government approval.

Field Development The development plan for Located on Block WA P, Ichthys is one of Australia’s biggest undeveloped gas projects estimated to contain recoverable reserves of

The FPSO Turritella will connect to subsea infrastructure located beneath approximately 9, ft (2, m) of water, breaking the existing water depth record for an oil and gas production facility. This ultra-deepwater project marks the first FPSO for Shell in the GoM, and the second FPSO in the GoM.

Copy Right CapGrow Pte. All Rights Reserved Workshop Overview The course will provide a complete and comprehensive technical overview of an FPSO from design, construction and commissioning to start-up and operations. The delegates will be presented with the applicable rules and regulations, codes, standards and environmental issues and their impact on the design and operation in connection with floating production.

Safety in design and operation will give a comprehensive description of safety philosophies and risk management including the safety and control systems. The course continues with the commercial aspects of an FPSO and its operation. The advantages and disadvantages of a new built or a conversion and the cost impact. Two real life case studies will explain the design, construction and operation setbacks encountered during the projects and their cost impact.

Fpso Dp Study

Orientate LCR along the most favourable heading to wind and waves. All parties agreed to proceed with consideration to actual weather condition. Refer to Section 1.

Electrical/Instrumentation Hook-up, Commissioning/Start-Up of the BONGA FPSO, Electrical Installation & Routing of E & I Cables, Construction of Cable Tray Support, Instrument stanchion and racks. Packing of Cable Transit Blocks, Glanding and Termination,Connections:

Kapal tunda digunakan pula untuk menarik tongkang, kapal rusak, dan peralatan lainnya. Kapal tunda memiliki tenaga yang besar bila dibandingkan dengan ukurannya. Kapal tunda zaman dulu menggunakan mesin uap, saat ini menggunakan mesin diesel. Mesin Induk kapal tunda biasanya berkekuatan antara sampai tenaga kuda s. Kebanyakan mesin yang digunakan sama dengan mesin kereta api, tetapi di kapal menggerakkan baling-baling.

Dan untuk keselamatan biasanya digunakan minimum dua buah mesin induk. Kapal tunda memiliki kemampuan manuver yang tinggi, tergantung dari unit penggerak. Kapal Tunda dengan penggerak konvensional memiliki baling-baling di belakang, efisien untuk menarik kapal dari pelabuhan ke pelabuhan lainnya.

A New FPSO Saipem M.V. Betatank II

Since then, a number of additional packages have also been awarded. Contracts are now being awarded to equipment manufacturers who also demonstrate that a significant part of the work will be performed locally in line with the provisions of the local content act. Hull and topside packages: The Egina project is valued at USD 15 billion. It consists of 44 wells connected to the 2.

The development of the DP-FPSO builds from the experience obtained with the BP Seillian FPSO, disconnectable turret technology, and the latest generation of dynamically positioned Drillships specifically designed for water depths up to 3, meters.

Sonsub Division contract to perform positioning and heading control for the hook-up operations of a new floating production, storage and offloading FPSO unit in a depth of meters in the Aquila Field, Adriatic Sea, Italy. Initiated in August , the agreement included carrying out FPSO positioning and heading control analyses; analyzing optimized anchor handling scenarios for the FPSO mooring hook-up; and producing marine and survey procedures. InterMoor also procured the FPSO aft and forward towing equipment and provided tow masters and surveyors for the offshore operation.

Aquila Field was developed in March ; 50 kilometers northeast of Brindisi, Italy, in international waters within the continental shelf. In , the old FPSO hull was inspected and proven to be unfit for further use. A shuttle tanker then moored up to the FPSO and the contents were discharged accordingly. Three HCTs were utilized to maintain the FPSO within the specified offset and heading angle tolerance throughout the mooring line, umbilical and riser hook-up operations.

The offshore operations were attended by two tow masters and three surveyors from InterMoor who were responsible for all FPSO and vessel spread movements for the project duration. The Aquila project was completed safely and successfully on Oct.

A History: ’s Word of the Year

Officially named in February, the Terra Nova FPSO is the first of its kind, designed specifically for the harsh environmental conditions offshore Newfoundland. Onceberthed at the Bull Arm site, it will undergo seven months of hook-up andcommissioning work prior to its journey offshore to begin producing oil from theTerra Nova oil field. By the timethe vessel arrives all the topsides modules and the upper turret will be in Bull Arm, and we’ll begin the next phase of the development – topsides hook up andcommissioning.

We are looking forward to the day when the Terra Nova FPSO, once installed offshore, will start production of the second major oil field off Newfoundland and Labrador, further establishing the oil and gas industry here”. It is designed with a productioncapacity of up to , barrels of oil per day, and a storage capacity of , barrels.

Over the summer and autumn, the FPSO vessel will undergo hook up and commissioning, in preparation for the planned voyage to the Terra Nova field toward the end of the year.

FPSO Installation and Hook-Up Semar was also responsible for the tow to field and hook-up of the FPSO. The project, contracted to approximately 1 billion NOK, had its administrative center in the Semar office. The management of the project included 10 vessels and people.

Reports to Project Manager. Be the single provider of cost, budget, milestone and progress data to parties outside the Engineering Department including: The Head of Engineering and Project Services shall participate in all phases of the project including, concept selection, FEED and project execution to ensure the technical objectives are met within the approved scope, budget and schedule and to the required quality standards The position is based in Nigeria and it is expected that the duration of the project will be 3 years.

The engineer will be expected to travel to locations where equipment is being manufactured such as, but not limited to the UK, US, Singapore, Dubai and Nigeria including stints offshore during hook up and commissioning. Promote effective communication and innovative challenge within the engineering disciplines in order to foster the production of safe, cost effective, fit for purpose and constructible designs.

Ensure all technical interfaces are identified and that the protocol for managing them is known by all disciplines and is being adhered to. Ensure that the protocol for managing concessions and deviations is known by all disciplines and is being adhered to. Conductor Supported Platform installation experience is a plus.

Financial news

History[ edit ] Oil has been produced from offshore locations since the late s. Originally, all oil platforms sat on the seabed, but as exploration moved to deeper waters and more distant locations in the s, floating production systems came to be used. It is expected to be the World’s First Floating Liquefaction Unit in operation when completed in

• Address sparing requirements for hook-up and integration scope for the CPF and FPSO and liaise with logistics as required. • Maintain a pan-project oversight of progress towards offshore hook-up & integration of the multiple facilities.

Safety Data Sheet for the cargo was available on request. All the usual cargo documentation is issued by the terminal. Emergency evacuation by helicopter is possible to Luanda. There are no facilities at the terminal for the receipt or supply of either fresh water or bunkers. Reference is made to limited facilities in Luanda in the Port Information Book. The depths on these wellheads, which appear to be unconnected, were not ascertained by our vessel. Current and Prevailing Winds: Whilst wind direction is fairly constant from the SW through to SE, current direction can be quite variable, and heading on the buoy can be at right angles to swell causing vessel to roll or pitch if heading into the swell.

Sea and swell are stronger from May to October. Fishing and Navigation Prohibited: The prohibited area is centred on position Lat. Notice of Readiness NOR: Any change in ETA must be duly notified. Ballast may not be discharged without the Pilot’s permission.

Offshore Shipping Online

Review systems, sub-system boundary drawings. Review equipment spare parts inventory to ensure adequate supply and spares for non stop an continuous operation. Team skills and capability to ensure their competency and reliability. Provide technical advise applicable for the implementation of maintenance and failure analysis.

Full Floating LNG Chain Platform Mounted LNG Plant LNG Lin Haulback Conoco erminal 1 1 LNG FPSO anco Namibia Belanak LPG FPSO EPC EA FPSO Shell erra Nova FPSO on-site hook-up and commissioning. FPSO Expertise + LNG Experience + Modularization Experience = Innovative FLNG Designs 4 A History of Success.

Petrojarl I is equipped with an Offloading crane on the port side aft. The catenary hoses 3 off are installed on the jib end of the crane and hang in a loop between Petrojarl I and the shuttle tanker during offloading. The MBC is installed in between jib end hose and the middle hose and is serviced at 5 yearly intervals by Gall Thomson. During the 21 years of operation and with almost hook ups offloadings on both Norweigian and English Sectors, the MBC has performed faultlessly.

In connection with the loading of oil from Draugen to the tanker Navion Scandia on 10 January an incident resulted in the rupture of the loading hose. This led to the accidental discharge of around 6 m3 of oil into the sea. The loading hose between the loading buoy on Draugen and the tanker Navion Scandia was equipped with a Marine Breakaway Coupling.

The MBC prevented a larger discharge of oil.

Installation procedures of Mooring buoy for BDPOC